    الإستقبال : Rehabilitation of the popular neiborhoods  Third section
 
Urban renovation
Third section

Following unexpected visits of the President in popular neiborhoods, a broad programme of rehabilitation of the peripheral and spontaneous districts was started.

  • El Kabaria District
City : Ennasr
Components of intervention : 2 Km of roads
Number of inhabitants : 600 inhabitants
Surface: 3 Ha
Cost : 200.000 DT

City : Ennour 2
Components of intervention: 5 Km of roads.
Number of inhabitants : 1500 inhabitants
Surface: 8 Ha.
Cost : 500.000 DT.

Total
Components of intervention : 7 Km of roads
Number of inhabitants : 2100 inhabitants
Surface : 11 Ha.
Cost 700.000 DT.

Top

  • Arrondissement of Sidi H’ssine
Zone of intervention: the remaining of Sidi H’ssine cities
Components of intervention 20 km of roads .
drainage of rain water 500 metres
Number of inhabitants: 60.000.
Surface : 100 Ha.
Cost : 3.000.000 DT.
Top
  • District of Hrairia
City : Agba
Road : 7 km
public lightening: 80 points
Number of inhabitants: 3500 inhabitants
Surface: 15 Ha
Cost:740.000 DT

City : remaining of Bougatfa 1 city
Road: 5 km.
public lightening: 8 points
Number of inhabitants : 1800 inhabitants
Surface: 10 Ha.
Cost 540.000 DT.

City : El Qorbi
Road : 2km.
Number of inhabitants 350 inhabitants
Surface 2 Ha.
Cost : 200.000 DT.

City : Aquacha
Road : 1.5 km.
Number of inhabitants: 350 inhabitants
Surface : 1.5 Ha.
Cost : 150.000 DT.

City : Ezzouhour 4
Road : 1km.
Number of inhabitants:: 250 inhabitants
Surface 1 Ha.
Cost : 100.000 DT.

Total
Road : 16.5 km.
public lightening : 160 points.
Number of inhabitants: : 6250 inhabitants
Surface 29.5 Ha.
Cost : 1.730.000 D.

Top
  • District of Ouardia

City: El Faouz
Roads: 1.5 km.
public lightening : 20 points.
Number of inhabitants: 350 inhabitants.
Surface: 2 Ha.
Cost : 160.000 DT .

City : remaining quarters of Mohamed Ali KAMBOU
Roads: 1.5 Km.
Number of inhabitants 500 inhabitants
Surface 3 Ha.
Cost : 150.000 DT.

Total
roads : 3 Km.
public lightening 20 points.
Number of inhabitants: 850 inhabitants .
Surface 5 Ha.
Cost : 310.000 DT.

 