    الإستقبال : Rehabilitation of the popular neiborhoods  National project
 
Urbanism - Urban renovation
District: Sidi H’ssine
Project of total Urban Development in Sidi H’ssine
A National project
  • Projects achieved 

    District: Sidi H’ssine
    A part of Bougatfa 2 city
    Nature of works :
    • Paving of the roads:10.000 linear meters
    • Drainage of rain water:: 1.000 linear meters
    • Number of concerned inhabitations : 1.000
    • Surface of intervention : 22 Ha
    • Cost : 1.305.000 DT.
    Mrad 2 city
    Nature of works :
    • Paving of the roads: 5.500 linear meters.
    • Drainage of waste water: 4.500 linear meters.
    • Number of concerned inhabitations: 450
    • Surface of intervention: 11Ha.
    • Cost : 784.000 DT.
    Destructed roads
    Nature of works:
    • Paving of the roads and draining the rain water: 5.861 linear meters
    • Surface of intervention : all the zone
    • Cost : 453.000 DT.
    Construction of a fountain
    Nature of works:
    • Construction of a fountain.
    • Creation of green spaces
    • Cost : 128.000 DT
    Rehabilitation of terraces
    Nature of woks :
    • Rehabilitation of terraces of principal roads : 16.000 M2
    • Total Cost : 280.000 DT.
    Total
    Nature of works :
    • Paving of the roads: 21.361linear meters.
    • Drainage of rain water: 1000 linear meters
    • Drainage of waste water: 4.500 linear meters
    • Construction of a fountain
    • Rehabilitation of terraces : 16000 M2.
    • Number of concerned inhabitations :1450 inhabitations
    • Surface of intervention : 33 Ha.
    • Cost : 3.022.000 DT.
  •  