    الإستقبال : The Medina  Project of the restoration of the mosque of Ezzitouna
 

The Medina projects

The mosque Ezzitouna
The project of the restoration of the Ezzitouna mosque aims to consolidate the civilizational role of the Ezzitouna mosque and the development of its architectural components...

Financing :

90% of the overall costs of the project were granted by the Funds Arab of Economic development and Social, is 250,000 DT, as for the Municipality of Tunis, it dealt with 10% of the cost of the project.

This with an aim of allowing the citizens to dedicate themselves to the worships of God and to practice the religious practices, to assist with the conferences and of the lessons of preachings under the best conditions.

  • External lighting

  • The demounting of the defective installation. The installation of a new network of lighting including :
    • The lighting of the alleys, the patios of the mosque and the galleries opening on the frontage of the mosque.
    • The installation of projectors (technical lighting) to emphasize the mosque.
    • The installation of an inverter to guarantee an emergency lighting in the event of cut of electricity.
    This work was completed of overall costs of 103.726,000 DT

    Renewal of the network of public lighting :

    The demounting of the defective existing installation.

    • The installation of a new network of lighting in the room of prayer and appendices.

    • The lighting of the minaret of the mosque and renewal of the network of lighting of the galleries of the mosque.

    Labor costs : 142,810,590 DT

    Work was completed it : April 2nd, 2002.

    A switchyard was installed making it possible to air the mosque well and to ensure of it better an integral lighting and external.

    Air-conditioning :
    To rebalance the frequentation of the various sections of the avenue by developing other centers of interest and by facilitating displacements (to arrange passages between sections and banks, gravitational equipment installation of new)

    redynamiser the avenue from the points of view economic, social and cultural.

    The sound equipment :

    Work of the installation of the sound equipment understood the installation of the new sound unit ensuring the amplification of the sound and the call to the prayer in the room of prayer and the renewal of the network of lighting in the patios and the external galleries of the mosque.

    The cost of the installation of the sound equipment: 49,973,000 DT

    Work was completed it: March 31st, 2003

    Work of civil engineering :

    The Association of the Safeguard of Medina (the ASM) was in charge of the development of the studies necessary to rehabilitate the periphery of the Ezzitouna mosque.

    This work consists of:

    • The development of the presidential door of the mosque opening on the souk El Attarine.

    • The rehabilitation of the frontage of el Koutteb or the library of Abou Farès Abdelaziz opening on the souk of fabric.

    Labor costs : 530,764,000 DT

  • Souk El Attarine
  • Souk El Q'mach ( Tissu)
  •  